[Case Study of Tamerba] Energy Storage System Utilizing EV Reuse Batteries
Installed alongside a solar power generation system! Introduced for peak cutting during normal times and BCP measures during power outages.
We would like to introduce a case where the industrial and grid-connected storage system "TAMERBA" was implemented in Yamaguchi City, Yamaguchi Prefecture. In developing and constructing a storage system utilizing reused EV batteries, Nishimu was responsible for the design, procurement, and construction of the storage system. The storage system is installed alongside a solar power generation system and was introduced for the purpose of peak cutting during normal times and BCP measures during power outages. 【Case Overview】 ■ Storage System: 250kW output + approximately 1MWh capacity ■ Yamaguchi City, Yamaguchi Prefecture ■ Construction completed in 2021 ■ Storage system utilizing reused EV batteries ■ Nishimu was responsible for the design, procurement, and construction of the storage system *For more details, please refer to the PDF document or feel free to contact us.
- Company:ニシム電子工業 総務部 総務Gr
- Price:Other